With straight panels - Step construction

1

2

Make the bathtub cladding without footboard

3

Cut out identically sized supports for the step from residual material. Glue together with COL-MK at regular intervals on the floor and bathtub exterior.

4

Apply COL-MK to exposed top and side edges of the support elements. Apply in a snake-like pattern.

5

Cut out the front and top sides of the steps from residual material. First glue on the front section, then the top section.

6

Additionally fix the top and side section with FIX-SD 80.
TIP: Pre-pierce dowel holes using a cross slot screwdriver

7

The steps must not be continued to the wall. Allow to dry after gluing.

8

All element joints are to be reinforced with ARM-100 SK glass fibre reinforcement strips … …

9

… and level out with COL-AK. The surface is now ready for tiling. Further requirements (e.g. sealing for wet loads) must be taken into consideration in accordance with national directives.